Current through the 2024 Fourth Special Session
Section 73-10f-2 - Bear River feasibility studies(1) The division is directed to undertake a study of the feasibility of developing the Bear River. This study shall include the following components: (a) an assessment of present water supplies, uses, and rights and future water needs in counties within the Bear River Basin and along the Wasatch Front;(b) an evaluation of alternative dam and reservoir sites;(c) a review of preliminary design work;(d) an update of the cost estimates;(e) an assessment of environmental impacts;(f) water quality analyses; and(g) financial and economic analyses.(2) The division shall: (a) report to the task force on the progress of the studies upon the request of the chairmen; and(b) report its interim conclusions and recommendations to the task force by October 31, 1990, and its final conclusions and recommendations by October 31, 1991.Enacted by Chapter 206, 1990 General Session