43 U.S.C. § 390h-12h

Current through P.L. 118-106 (published on www.congress.gov on 10/04/2024)
Section 390h-12h - El Paso Water Reclamation and Reuse Project
(a) Authorization

The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the El Paso Water Reclamation and Reuse Project to reclaim and reuse wastewater in the service area of the El Paso Water Utilities Public Service Board, El Paso, Texas.

(b) Cost share

The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.

(c) Limitation

The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).

43 U.S.C. § 390h-12h

Pub. L. 102-575, title XVI, §1622, as added Pub. L. 104-266, §2(a)(2), Oct. 9, 1996, 110 Stat. 3292.