42 U.S.C. § 16320

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 16320 - Spallation Neutron Source
(a) Definitions

In this section:

(1) SING

The term "SING" means the Spallation Neutron Source Instruments Next Generation major item of equipment.

(2) SNS power upgrade

The term "SNS power upgrade" means the Spallation Neutron Source power upgrade described in the 20-year facilities plan of the Office of Science of the Department.

(3) SNS second target station

The term "SNS second target station" means the Spallation Neutron Source second target station described in the 20-year facilities plan of the Office of Science of the Department.

(4) Spallation Neutron Source Facility

The terms "Spallation Neutron Source Facility" and "Facility" mean the completed Spallation Neutron Source scientific user facility located at Oak Ridge National Laboratory, Oak Ridge, Tennessee.

(5) Spallation Neutron Source Project

The terms "Spallation Neutron Source Project" and "Project" means Department Project 99-E-334, Oak Ridge National Laboratory, Oak Ridge, Tennessee.

(b) Spallation Neutron Source Project
(1) In general

The Secretary shall submit to Congress, as part of the annual budget request of the President submitted to Congress, a report on progress on the Spallation Neutron Source Project.

(2) Contents

The report shall include for the Project-

(A) a description of the achievement of milestones;
(B) a comparison of actual costs to estimated costs; and
(C) any changes in estimated Project costs or schedule.
(c) Spallation Neutron Source Facility plan
(1) In general

The Secretary shall develop an operational plan for the Spallation Neutron Source Facility that ensures that the Facility is employed to the full capability of the Facility in support of the study of advanced materials, nanoscience, and other missions of the Office of Science of the Department.

(2) Plan

The operational plan shall-

(A) include a plan for the operation of an effective scientific user program that-
(i) is based on peer review of proposals submitted for use of the Facility;
(ii) includes scientific and technical support to ensure that external users, including researchers based at institutions of higher education, are able to make full use of a variety of high quality scientific instruments; and
(iii) phases in systems upgrades to ensure that the Facility remains at the forefront of international scientific endeavors in the field of the Facility throughout the operating life of the Facility;
(B) include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and
(C) address the status of and, to the maximum extent practicable, costs and schedules for-
(i) full user mode operations of the Facility;
(ii) instrumentation built at the Facility during the operating phase through full use of the experimental hall, including the SING;
(iii) the SNS power upgrade; and
(iv) the SNS second target station.
(d) Authorization of appropriations
(1) Spallation Neutron Source Project

There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which-

(A) $1,192,700,000 shall be used for the costs of construction; and
(B) $219,000,000 shall be used for other Project costs.
(2) Spallation Neutron Source Facility
(A) In general

Except as provided in subparagraph (B), there is authorized to be appropriated for the Spallation Neutron Source Facility for-

(i) the SING, $75,000,000 for each of fiscal year 2007 through 2009; and
(ii) the SNS power upgrade, $160,000,000, to remain available until expended.
(B) Insufficient stockpiles of heavy water

If stockpiles of heavy water of the Department are insufficient to meet the needs of the Facility, there is authorized to be appropriated for the Facility $12,000,000 for fiscal year 2007.

42 U.S.C. § 16320

Pub. L. 109-58, title IX, §980, Aug. 8, 2005, 119 Stat. 905.
Secretary
The term "Secretary" means the Secretary of Housing and Urban Development.1See References in Text note below.
project
The terms "federally assisted housing" and "project" mean-(A) a public housing project (as such term is defined in section 3(b) of the United States Housing Act of 1937 [42 U.S.C. 1437a(b)] );(B) housing for which project-based assistance is provided under section 8 of the United States Housing Act of 1937 [42 U.S.C. 1437f] ;(C) housing that is assisted under section 1701q of title 12;(D) housing that is assisted under section 1701q of title 12, as such section existed before November 28, 1990;(E) housing financed by a loan or mortgage insured under section 1715l(d)(3) of title 12 that bears interest at a rate determined under the proviso of section 1715l(d)(5) of title 12;(F) housing insured, assisted, or held by the Secretary or a State or State agency under section 1715z-1 of title 12;(G) housing constructed or substantially rehabilitated pursuant to assistance provided under section 8(b)(2) of the United States Housing Act of 1937 [42 U.S.C. 1437f(b)(2)], as in effect before October 1, 1983, that is assisted under a contract for assistance under such section; and(H) housing that is assisted under section 80131 of this title.