Not later than 180 days after December 27, 2020, and in conjunction with the development of procedures under section 1962-4 of title 42, the Secretary is directed to review, and where appropriate, revise the existing planning guidance documents and regulations of the Corps of Engineers on the assessment of the effects of sea level rise or inland flooding on future water resources development projects to ensure that such guidance documents and regulations are based on the best available, peer-reviewed science and data on the current and future effects of sea level rise or inland flooding on relevant communities.
In carrying out this subsection, the Secretary shall-
Upon the request of a non-Federal interest, in carrying out a feasibility study for a project for flood risk mitigation, hurricane and storm damage risk reduction, or ecosystem restoration under section 2282 of this title, the Secretary shall consider whether the need for the project is predicated upon or exacerbated by conditions related to sea level rise or inland flooding.
To the maximum extent practicable, in carrying out a study pursuant to paragraph (1), the Secretary shall document the potential effects of sea level rise or inland flooding on the project, and the expected benefits of the project relating to sea level rise or inland flooding, during the 50-year period after the date of completion of the project.
33 U.S.C. § 2282f
EDITORIAL NOTES
CODIFICATIONSection was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
STATUTORY NOTES AND RELATED SUBSIDIARIES
"SECRETARY" DEFINED Secretary means the Secretary of the Army, see section 2 of div. AA of Pub. L. 116-260 set out as a note under section 2201 of this title.