16 U.S.C. § 837e

Current through P.L. 118-107 (published on www.congress.gov on 11/21/2024)
Section 837e - Transmission lines for other electric energy; rates

Any capacity in Federal transmission lines connecting, either by themselves or with non-Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific Northwest, which is not required for the transmission of Federal energy or the energy described in section 837h of this title, shall be made available as a carrier for transmission of other electric energy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at appropriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in section 837h of this title, or other electric energy.

16 U.S.C. § 837e

Pub. L. 88-552, §6, Aug. 31, 1964, 78 Stat. 758.
Pacific Northwest
"Pacific Northwest" means (1) the region consisting of the States of Oregon and Washington, the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming within the Columbia drainage basin and of the State of Idaho as the Secretary may determine to be within the marketing area of the Federal Columbia River power system, and (2) any contiguous areas, not in excess of seventy-five airline miles from said region, which are a part of the service area of a rural electric cooperative served by the Administrator on December 5, 1980, which has a distribution system from which it serves both within and without said region.
Secretary
"Secretary" means the Secretary of Energy.