16 U.S.C. § 837a

Current through P.L. 118-44 (published on www.congress.gov on 03/18/2024), except for [P. L. 118-42]
Section 837a - Limitation of sale, delivery, and exchange of electric energy and electric peaking capacity for use outside Pacific Northwest to surplus energy and surplus peaking capacity; notice to customers; inspection of contract drafts

Subject to the provisions of this chapter, the sale, delivery, and exchange of electric energy generated at, and peaking capacity of, Federal hydroelectric plants in the Pacific Northwest for use outside the Pacific Northwest shall be limited to surplus energy and surplus peaking capacity. At least 30 days prior to the execution of any contract for the sale, delivery, or exchange of surplus energy or surplus peaking capacity for use outside the Pacific Northwest, the Secretary shall give the then customers of the Bonneville Power Administration written notice that negotiations for such a contract are pending, and thereafter, at any customer's request, make available for its inspection current drafts of the proposed contract.

16 U.S.C. § 837a

Pub. L. 88-552, §2, Aug. 31, 1964, 78 Stat. 756.

STATUTORY NOTES AND RELATED SUBSIDIARIES

TRANSFER OF FUNCTIONSFunctions of Secretary of the Interior with respect to Bonneville Power Administration transferred to Secretary of Energy by section 7152(a)(1)(D), (2) of Title 42, The Public Health and Welfare, with Bonneville Power Administration to be preserved as a distinct organizational entity within Department of Energy and headed by an Administrator.

Pacific Northwest
"Pacific Northwest" means (1) the region consisting of the States of Oregon and Washington, the State of Montana west of the Continental Divide, and such portions of the States of Nevada, Utah, and Wyoming within the Columbia drainage basin and of the State of Idaho as the Secretary may determine to be within the marketing area of the Federal Columbia River power system, and (2) any contiguous areas, not in excess of seventy-five airline miles from said region, which are a part of the service area of a rural electric cooperative served by the Administrator on December 5, 1980, which has a distribution system from which it serves both within and without said region.
Secretary
"Secretary" means the Secretary of Energy.
Surplus energy
"Surplus energy" means electric energy generated at Federal hydroelectric plants in the Pacific Northwest which would otherwise be wasted because of the lack of a market therefor in the Pacific Northwest at any established rate.
Surplus peaking capacity
"Surplus peaking capacity" means electric peaking capacity at Federal hydroelectric plants in the Pacific Northwest for which there is no demand in the Pacific Northwest at any established rate.