After the map, profile, specifications, and estimates are completed, the engineer shall sign them and file them with the secretary of the board.
Tex. Water Code § 55.337
After the map, profile, specifications, and estimates are completed, the engineer shall sign them and file them with the secretary of the board.
Tex. Water Code § 55.337