A person making an application to the railroad commission for a permit under this subchapter shall submit with the application a letter of determination from the commission concluding that drilling and operating an anthropogenic carbon dioxide injection well for geologic storage or constructing or operating a geologic storage facility will not impact or interfere with any previous or existing Class I injection well, including any associated waste plume, or any other injection well authorized or permitted by the commission.
Tex. Water Code § 27.0461