Section 15.911 - Findings Regarding Permits
(a) The board may not release funds for the construction phase of that portion of a project that proposes surface water or groundwater development until the executive administrator makes a written finding:
(1) that the political subdivision or water supply corporation proposing surface water development has the necessary water right authorizing it to appropriate and use the water that the project will provide; or
(2) that the subdivision or corporation proposing groundwater development has the right to use water that the project will provide.
(b) If the political subdivision or water supply corporation includes a proposal for a wastewater treatment project, the board may not release funds for the project construction until the subdivision or corporation has received a permit for the construction and operation of the project and approval of the plans and specifications for the project in a manner that will satisfy commission requirements for design criteria and permit conditions that apply to construction activities.

Tex. Water Code § 15.911

Amended By Acts 2005, 79th Leg., Ch. 1151, Sec. 10, eff. 6/18/2005.