Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 36.204 - Cost Recovery And Incentives In establishing rates for an electric utility, the commission may:
(1) allow timely recovery of the reasonable costs of conservation, load management, and purchased power, notwithstanding Section 36.201; and(2) authorize additional incentives for conservation, load management, purchased power, and renewable resources.Amended by Acts 1999, 76th Leg., ch. 405, Sec. 27, eff. 9/1/1999. Acts 1997, 75th Leg., ch. 166, Sec. 1, eff. 9/1/1997.