Tex. Util. Code § 39.167

Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 39.167 - [Multiple Versions] Reliability Plan For Permian Basin
(a) Not later than January 30, 2024, the commission shall direct the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability plan under Section 39.166 for the Permian Basin region.
(b) The plan must:
(1) address extending transmission service to areas where mineral resources have been found;
(2) address increasing available capacity to meet forecasted load; and
(3) provide available infrastructure to reduce interconnection times in areas without access to transmission service.
(c) This section expires September 1, 2025.

Tex. Util. Code § 39.167

Added by Acts 2023, Texas Acts of the 88th Leg.- Regular Session, ch. 892,Sec. 3, eff. 6/13/2023.