Tex. Transp. Code § 366.004

Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 366.004 - Construction Costs Defined
(a) The cost of acquisition, construction, improvement, extension, or expansion of a turnpike project or system under this chapter includes the cost of:
(1) the actual acquisition, construction, improvement, extension, or expansion of the turnpike project or system;
(2) the acquisition of real property, rights-of-way, property rights, easements, and other interests in real property;
(3) machinery and equipment;
(4) interest payable before, during, and after acquisition, construction, improvement, extension, or expansion as provided in the bond proceedings;
(5) traffic estimates, revenue estimates, engineering and legal services, plans, specifications, surveys, appraisals, construction cost estimates, and other expenses necessary or incidental to determining the feasibility of the construction, improvement, extension, or expansion;
(6) necessary or incidental administrative, legal, and other expenses;
(7) compliance with laws, regulations, and administrative rulings;
(8) financing;
(9) the assumption of debts, obligations, and liabilities of an entity relating to a turnpike project or system transferred to an authority by that entity; and
(10) expenses related to the initial operation of the turnpike project or system.
(b) Costs attributable to a turnpike project or system and incurred before the issuance of bonds to finance the turnpike project or system may be reimbursed from the proceeds of sale of the bonds.

Tex. Transp. Code § 366.004

Amended by: Acts 2005, 79th Leg., Ch. 281 (H.B. 2702), Sec. 2.57, eff. June 14, 2005
Added by Acts 1997, 75th Leg., ch. 1171, Sec. 7.24, eff. Sept. 1, 1997.