Tenn. Code § 54-1-501

Current through Acts 2023-2024, ch. 1069
Section 54-1-501 - Use of construction manager/general contractor and progressive design-build services
(a) Notwithstanding another law to the contrary, the department is authorized to use the construction manager/general contractor (CM/GC) method and progressive design-build (PDB) method as delivery methods for procuring transportation project services.
(b) The department shall select CM/GC and PDB projects based upon generally accepted industry criteria that include factors such as fostering innovation, mitigating risk, improving design quality, improving cost control, and optimizing construction schedules.
(c) Types of projects suited for CM/GC and PDB methods include, but are not limited to, instances where the department needs feedback during the design phase due to complex components that require innovation, projects that have public involvement, projects that have third-party considerations such as acquisition of right-of-way or utility relocation issues, or situations where other factors impact the overall schedule. Types of projects not suited for the CM/GC or PDB methods include, but are not limited to, routine maintenance and resurfacing projects or other construction projects that present a low level of technical complexity, a low level of risk management, and simple traffic phasing, and that do not have a compelling need for project acceleration.

T.C.A. § 54-1-501

Amended by 2023 Tenn. Acts, ch. 159, s 3, eff. 4/17/2023.
Acts 2013, ch. 366, § 1; 2019, ch. 106, § 1.