S.D. Codified Laws § 45-5A-5.2

Current through the 2024 Legislative Session
Section 45-5A-5.2 - Damages for failure to provide notice

The surface owner, and surface lessee, if any, may seek actual and punitive damages in the court of proper jurisdiction if the mineral developer fails to provide the notice required by § 45-5A-5 or the notice required by § 45-5A-5.1.

SDCL 45-5A-5.2

SL 2013, ch 226, §2; SL 2014, ch 213, §1.
Amended by S.L. 2014, ch. 213,s. 1, eff. 7/1/2014.