Current through the 2024 Legislative Session
Section 34-20E-4 - Grounds for extension of time to submit informationThe board may grant an extension of the time in which a dispenser must report the information required by § 34-20E-2 to any dispenser that is unable to submit prescription information by electronic means because of one of the following occurrences:
(1) The dispenser suffers a mechanical or electronic failure or cannot report within the required time for other reasons beyond the dispenser's control;(2) The central repository is unable to receive electronic submissions; or(3) Good cause shown by a dispenser.