The department is authorized to enter into contracts with any municipal or public corporation or political subdivision within the state for the purpose of assisting such agencies to finance the design and construction of water pollution control projects, whether procured through chapter 39.10 or 70A.140 RCW, or otherwise, that are necessary to prevent the discharge of untreated or inadequately treated sewage or other waste into the waters of the state, including but not limited to, systems for the control of storm or surface waters which will provide for the removal of waste or polluting materials in a manner conforming to the comprehensive plan of water pollution control and abatement proposed by the agencies and approved by the department. Any such contract may provide for:
The payment by the department to a municipal or public corporation or political subdivision on a monthly, quarterly, or annual basis of varying amounts of moneys as advances which shall be repayable by said municipal or public corporation, or political subdivision under conditions determined by the department.
Contracts made by the department shall be subject to the following limitations:
In making such contracts the department shall give priority to projects which will provide relief from actual or potential public health hazards or water pollution conditions and which provide substantial capacity beyond present requirements to meet anticipated future demand.
RCW 90.48.285
Purpose-Short title-Construction-Rules-Severability-Captions-1987 c 109: See notes following RCW 43.21B.001.
Severability-1969 ex.s. c 141: "If any provision of this act, or its application to any person or circumstance is held invalid, the remainder of the act, or the application of the provisions to other persons or circumstances is not affected." [ 1969 ex.s. c 141 s 2.]