Wash. Rev. Code § 60.24.070

Current through 2024
Section 60.24.070 - Period covered by stumpage lien

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.

RCW 60.24.070

1893 c 132 § 6; RRS § 1167. Prior: Code 1881 § 1946; 1877 p 217 § 8.