Current through the 2024 Regular Session
Section 36.70A.730 - Report by watershed group-Director consults with statewide advisory committee(1) Upon receipt of a report by a watershed group under RCW 36.70A.720(2)(b) that the work plan goals and benchmarks have been met, the director must consult with the statewide advisory committee. If the director concurs with the watershed group report, the watershed group shall continue to implement the work plan. If the director does not concur with the watershed group report, the director shall consult with the statewide advisory committee following the procedures in subsection (2) of this section.(2) If either the director, following receipt of a report under subsection (1) of this section, or the watershed group, in the report submitted to the director under RCW 36.70A.720(2)(b), concludes that the work plan goals and benchmarks for protection have not been met, the director must consult with the statewide advisory committee for a recommendation on how to proceed. If the director, acting upon recommendation from the statewide advisory committee, determines that the watershed is likely to meet the goals and benchmarks with an additional six months of planning and implementation time, the director must grant an extension. If the director, acting upon a recommendation from the statewide advisory committee, determines that the watershed is unlikely to meet the goals and benchmarks within six months, the watershed is subject to RCW 36.70A.735.(3) A watershed that fails to meet its goals and benchmarks for protection within the six-month time extension under subsection (2) of this section is subject to RCW 36.70A.735.Added by 2011 c 360,§ 8, eff. 7/22/2011.