Wash. Rev. Code § 36.21.070

Current through Chapter 376 of the 2024 Regular Session
Section 36.21.070 - New construction building permits-Appraisal of building

Upon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.

RCW 36.21.070

1989 c 246 § 3; 1987 c 134 § 1; 1963 c 4 § 36.21.070. Prior: 1955 c 129 § 4.