73 Pa. Stat. § 180

Current through P.A. Acts 2023-32
Section 180 - Excavators, duties

It shall be the duty of each excavator who intends to perform excavation or demolition work within this Commonwealth:

(2.1) To request the location and type of facility owner lines at each work site by notifying the facility owner through the One Call System. Notification shall be not less than three nor more than ten business days in advance of beginning excavation or demolition work. No work shall begin earlier than the lawful start date which shall be on or after the third business day after notification. The lawful start date shall exclude the date upon which notification was received by the One Call System and notification received on a Saturday, Sunday or holiday, which shall be processed on the following business day. In the case of a complex project, notification shall not be less than ten business days in advance of the beginning of excavation or demolition work.
(2.2) To provide the One Call System with exact information to identify the work site so that facility owners might provide indications of their lines. An excavator shall be deemed to have met the obligations of clause (2.1) if he calls the One Call System, provides the work site and other required information and receives a serial number.
(3) In a complex project or if an excavator intends to perform work at multiple work sites or over a large area, to take reasonable steps to work with facility owners, including scheduling and conducting a preconstruction meeting, so that they may locate their facilities at a time reasonably in advance of the actual start of excavation or demolition work for each phase of the work. A preconstruction meeting may take place at any time prior to the commencement of excavation or demolition work, and the excavator, facility owners and designer, or their agents, shall attend the meeting. Notice of the meeting shall be given sufficiently in advance so as to permit attendance, either in person or electronically, by the excavator, facility owners and designer, or their agents, and shall include information sufficient to identify the scope of work. If the excavator does not believe that a preconstruction meeting is necessary under the circumstances of this clause it shall indicate such belief in its notice, but any facility owner with facilities at the work site may request a meeting with the excavator, and a meeting shall be held between the facility owner and the excavator. After commencement of excavation or demolition work, the excavator shall be responsible for protecting and preserving the staking, marking or other designation until no longer required for proper and safe excavation or demolition work at or near the underground facility or by contacting the One Call System to request that the facilities be marked again in the event that the previous markings have been compromised or eliminated.
(3.1) To comply with the requirements established by the One Call System as determined by the board of directors regarding the maximum area that a notification may cover.
(4) To exercise due care and to take all reasonable steps necessary to avoid injury to or otherwise interfere with all lines where positions have been provided to the excavator by the facility owners pursuant to section 2(5). Within the tolerance zone the excavator shall employ prudent techniques, which may include hand-dug test holes, vacuum excavation or similar devices to ascertain the precise position of such facilities. If insufficient information to safely excavate is available pursuant to section 2(5), the excavator shall employ like prudent techniques which shall be paid for by the project owner pursuant to clause (15) .
(5) If the facility owner fails to respond to the excavator's timely request as provided under section 2(5) or the facility owner notifies the excavator that the line cannot be marked within the time frame and a mutually agreeable date for marking cannot be arrived at, the excavator may proceed with excavation as scheduled, but not earlier than the lawful dig date, provided he exercises due care in his endeavors, subject to the limitations contained in this clause and clauses (2.1) through (4) and (20).
(6) To inform each operator employed by the excavator at the work site of such work of the information obtained by the excavator pursuant to clauses (2.1) through (5), and the excavator and operator shall:
(i) Plan the excavation or demolition work to avoid damage to or minimize interference with a facility owner's facilities in the construction area. Excavation or demolition work which requires temporary or permanent interruption of a facility owner's service shall be coordinated with the affected facility owner in all cases.
(ii) After consulting with a facility owner, provide such support and mechanical protection for known facility owner's lines at the construction work site during the excavation or demolition work, including during backfilling operations, as may be reasonably necessary for the protection of such lines.
(7) To report immediately to the facility owner any break or leak on its lines, or any dent, gouge, groove or other damage to such lines or to their coating or cathodic protection, made or discovered in the course of the excavation or demolition work. The One Call System board of directors may adopt procedures to permit reporting under this clause through the One Call System.
(8) To immediately notify 911 and the facility owner if the damage results in the escape of any flammable, toxic or corrosive gas or liquid which endangers life, health or property. The excavator shall take reasonable measures, based on its knowledge, training, resources, experience and understanding of the situation, to protect themselves and those in immediate danger, the general public, the property and the environment until the facility owner or emergency responders have arrived and completed their assessment and shall remain on the work site to convey any pertinent information to responders that may help them to safely mitigate the situation.
(9) The time requirements of clause (2.1) shall not apply to a facility owner or excavator performing excavation or demolition work in an emergency, as defined in section 1; nonetheless, all facility owners shall be notified as soon as possible before, during or after excavation or demolition work, depending upon the circumstances.
(11) To use the color white to mark a proposed excavation work site when exact work site information cannot be provided.
(11.1) To assist a facility owner in determining involvement of a facility owner's lines by disclosing additional available information requested by the facility owner, including dimensions and the direction of proposed excavations.
(11.2) If using horizontal directional drilling (HDD), at a minimum, to utilize the best practices published by the HDD Consortium.
(12) The following standards shall be applied in determining whether an excavator shall incur any obligation or be subject to liability as a result of an excavator's demolition work or excavation work damaging a facility owner's facilities:
(i) The excavator who has complied with the terms of this act and who was not otherwise negligent shall not be subject to liability or incur any obligation to facility owners, operators, project owners or other persons who sustain injury to person or property as a result of the excavator's excavation or demolition work damaging a facility owner's lines.
(ii) Where an excavator has failed to comply with the terms of this act or was otherwise negligent, and the facility owner or designer has misidentified, mislocated or failed to identify its facilities pursuant to this act, then in computing the amount of reimbursement to which the facility owner is entitled, the cost of repairing or replacing its facilities shall be diminished in the same proportion that the facility owner's or designer's misidentification, mislocation or failure to identify the facilities contributed to the damage. Should the facility owner or designer not have misidentified, mislocated or failed to identify its facilities pursuant to this act, there shall be no diminution of the facility owner's right of recovery.
(13) If, after receiving information from the One Call System or directly from a facility owner, the excavator decides to change the location, scope or duration of a proposed excavation, the obligations imposed by this section shall apply to the new location.
(14) If an excavator removes its equipment and vacates a work site for more than two business days, to renotify the One Call System unless other arrangements have been made directly with the facility owners involved in his work site.
(15) When the information required from the facility owner under section 2(5)(i) cannot be provided or, due to the nature of the information received from the facility owner, it is reasonably necessary for the excavator to ascertain the precise location of any line or abandoned or unclaimed lines by prudent techniques, which may include hand-dug test holes, vacuum excavation or other similar devices, the excavator shall promptly notify the project owner or the project owner's representative, either orally or in writing. If oral notification is given, the notice shall be reduced to writing within a reasonable time by the project owner or excavator. After giving such notice, the excavator shall be entitled to compensation from the project owner for this additional work as provided in the latest edition of the Pennsylvania Department of Transportation Form 408 specifications for extra work performed on a force account basis. The provisions of this subsection shall not be deemed to limit any other rights which the excavator has under its contract with the project owner or otherwise. Provisions in any contract, public or private, which attempt to limit the rights of excavators under this section shall not be valid for any reason, and any attempted waiver of this section shall be void and unenforceable as against public policy and any such attempted waiver shall be reported to the commission.
(16) To submit a report of alleged violation to the commission through the One Call System not more than ten business days after striking or damaging a facility owner's line during excavation or demolition or if the excavator believes a violation of this act has been committed in association with excavation or demolition work. The report of alleged violation shall be in a form and manner as required by the commission.
(17) To comply with all requests for information by the commission relating to the commission's enforcement authority under this act within thirty days of the receipt of the request.
(18) To, if it chooses to do so and if working for a facility owner, a municipality or a municipal authority, delegate the power to discharge the duties set forth in clauses (2.1) and (2.2) to its project owner, with the project owner's consent. If the power is delegated pursuant to this clause, both the excavator and the project owner shall be responsible for providing the required notices.
(19) To ensure the accuracy of any information provided to the One Call System pursuant to this section.
(20) To renotify the One Call System of an unmarked or incorrectly marked facility, if an original, proper, nonemergency locate request has been made to the One Call System and, upon initial arrival at the proposed work site, it is apparent to the excavator that there is an unmarked or incorrectly marked facility. An excavator may not begin excavating in the affected area of the work site until after receiving sufficient information from the facility owner to safely excavate. If the facility owner fails to provide sufficient information to the excavator within three hours after the excavator has notified the One Call System of the unmarked or incorrectly marked facility, the excavator may proceed with excavation subject to the limitations under clause (5).
(21) To make a locate request to the One Call System prior to excavation or demolition work and to pay the applicable fee for the request.

73 P.S. § 180

Amended by P.L. TBD 2017 No. 50, § 3, eff. 4/28/2018.
1974, Dec. 10, P.L. 852, No. 287, § 5, effective in 120 days. Amended 1986, Dec. 12, P.L. 1574, No. 172, § 1, effective in 180 days; 1991, Dec. 12, P.L. 364, No. 38, § 4, imd. effective; 1996, Dec. 19, P.L. 1460, No. 187, § 3, imd. effective; 2004, Nov. 30, P.L. 1567, No. 199, §2, effective in 60 days [ 1/31/2005]; 2006, Nov. 29, P.L. 1593, No. 181, §6, effective in 120 days [ 3/29/2007].