Current through the 2023 Legislative Sessions
Section 38-18-07 - Surface damage and disruption payments1. Unless the mineral lease, surface lease, or consent statement executed by the surface owner provides for payments to the surface owner, the mineral developer shall annually pay to the surface owner a sum of money equal to the amount of damages sustained by the surface owner for loss of agricultural production caused by mining activity, provided that it can be shown that the land disturbed or to be disturbed has regularly been used for agricultural production. The amount of damages may be determined by any formula mutually agreeable between the surface owner and the mineral developer. The payments contemplated by this section only cover land actually mined, disturbed, or to be mined during the year or years during which agricultural production was actually interrupted and which land has not been restored to the level of agricultural productivity required by the plan submitted pursuant to chapter 38-14.1. The payments to be made hereunder must be made before December thirty-first of that calendar year in which the loss occurred.2. Unless waived by the owner of a farm building, if the coal or commercial leonardite removal area of a surface mining operation comes within five hundred feet [152.4 meters] of any farm building, the mineral developer shall pay to the owner of the farm building either the fair market value of the farm building or the entire cost of removing the farm building to a location where the coal or commercial leonardite removal area of the mining operation will not come within five hundred feet [152.4 meters] of such building or buildings. The payments contemplated hereunder are in addition to any payments required by the terms of any mineral lease, unless the surface owner is a party to the lease and the lease provides for damages as contemplated in this subsection in an amount not less than the amount which would be recoverable under this section.3. The rights granted to the surface owner by this section are hereby declared to be absolute and unwaivable, except as provided in subsection 2. Any instrument which purports to waive rights granted by this section is null and void and of no legal effect.Amended by S.L. 2015, ch. 257 (SB 2377),§ 23, eff. 7/1/2015.