N.D. Cent. Code § 38-11.1-06

Current through 2023 Legislative Sessions
Section 38-11.1-06 - Protection of surface and ground water - Other responsibilities of mineral developer

If the domestic, livestock, or irrigation water supply of any person who owns an interest in real property within one-half mile [804.67 meters] of where geophysical or seismograph activities are or have been conducted or within one mile [1.61 kilometers] of an oil or gas well site has been disrupted, or diminished in quality or quantity by the drilling operations and a certified water quality and quantity test has been performed by the person who owns an interest in real property within one year preceding the commencement of drilling operations, the person who owns an interest in real property is entitled to recover the cost of making such repairs, alterations, or construction that will ensure the delivery to the surface owner of that quality and quantity of water available to the surface owner prior to the commencement of drilling operations. Any person who owns an interest in real property who obtains all or a part of that person's water supply for domestic, agricultural, industrial, or other beneficial use from an underground source has a claim for relief against a mineral developer to recover damages for disruption or diminution in quality or quantity of that person's water supply proximately caused from drilling operations conducted by the mineral developer. Prima facie evidence of injury under this section may be established by a showing that the mineral developer's drilling operations penetrated or disrupted an aquifer in such a manner as to cause a diminution in water quality or quantity within the distance limits imposed by this section. An action brought under this section when not otherwise specifically provided by law must be brought within six years of the time the action has accrued. For purposes of this section, the claim for relief is deemed to have accrued at the time it is discovered or might have been discovered in the exercise of reasonable diligence.

A tract of land is not bound to receive water contaminated by drilling operations on another tract of land, and the owner of a tract has a claim for relief against a mineral developer to recover the damages proximately resulting from natural drainage of waters contaminated by drilling operations.

The mineral developer is also responsible for all damages to person or property resulting from the lack of ordinary care by the mineral developer or resulting from a nuisance caused by drilling operations. This section does not create a cause of action if an appropriator of water can reasonably acquire the water under the changed conditions and if the changed conditions are a result of the legal appropriation of water by the mineral developer.

N.D.C.C. § 38-11.1-06