N.J. Stat. § 52:27D-132.4

Current through L. 2024, c. 80.
Section 52:27D-132.4 - Initial structural inspection, building components, primary load bearing system, covered building, timelines; reports
a. Following the issuance of a certificate of occupancy, an initial structural inspection of the building components forming the primary load bearing system of a covered building shall be undertaken by a post-occupancy structural inspector retained by the covered building owner within the earlier of:
(1) 15 years of the date on which the covered building receives a certificate of occupancy pursuant to section 15 of P.L.1975, c.217 (C.52:27D-133); or
(2) 60 days after observable damage to the primary load bearing system.
b. If a covered building has received a certificate of occupancy pursuant to section 15 of P.L.1975, c.217 (C.52:27D-133) prior to the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.), then an initial structural inspection shall be undertaken by a structural inspector based on the number of years the certificate of occupancy preceded the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.), as provided in this subsection. If the certificate of occupancy was provided:
(1) one day to 14 years and 364 days prior to the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.), then the structural inspection shall occur within one year of the date 15 years following the date of the issuance of the certificate of occupancy; or
(2) 15 or more years prior to the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.), then the structural inspection shall occur within two years following the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.).
c. A building that has been converted to a condominium or cooperative form of ownership after the effective date of P.L.2023, c.214 (C.52:27D-132.2 et al.) shall, as part of the process of registering the project pursuant to the "Planned Real Estate Development Full Disclosure Act," P.L.1977, c.419 (C.45:22A-21 et seq.) and the regulations promulgated thereunder, be required to follow the schedule of inspections provided in paragraphs (1) and (2) of subsection b. of this section.
d. After the post-occupancy structural inspector has performed an inspection pursuant to subsection a. of this section, the post-occupancy structural inspector shall issue a written report describing the condition of the primary load bearing system. The post-occupancy structural inspection report shall:
(1) set forth with specificity any required maintenance or repairs needed by the primary load bearing system;
(2) determine when the next inspection of the primary load bearing system shall be performed, but in no event shall a secondary inspection occur more than the earlier of:
(a) 10 years after the initial inspection has taken place; or
(b) not more than 60 days after there is observable damage to the primary load bearing system;
(3) be provided to the municipal appointing authority, the construction official and the enforcing agency;
(4) be prepared in accordance with the protocol established by the American Society of Civil Engineers, for the structural condition assessment of a covered building or a similar protocol by another nationally recognized structural engineering organization; and
(5) provide any other information or guidance necessary to maintain the structural integrity of a covered building.
e. If the structural inspector's report created pursuant to subsection d. of this section finds that corrective maintenance of the primary load bearing system is required, the report shall specify with reasonable detail the required corrective maintenance.
f. Notwithstanding the structural inspector's initial inspection and report undertaken pursuant to subsections a. through e. of this section, subsequent structural inspections and reports shall be provided for as set forth by the structural inspector's preceding report as follows:
(1) The structural inspector shall determine a reasonable period of time within which the next inspection shall take place provided, however, that any subsequent inspection under this paragraph shall not take place more than five years after a preceding inspection.
(2) The structural inspector shall review the preceding inspection report prior to undertaking subsequent inspection of the covered building. After the structural inspector completes this review and inspection, the structural inspector will then issue a subsequent inspection report which shall:
(a) make note of any new or progressive deterioration;
(b) set forth the covered maintenance required to address any new or progressive deterioration; and
(c) be provided to the covered building owner, who shall undertake measures necessary to effectuate the covered maintenance, including, but not limited to, engaging the services of an architect or engineer licensed by the State and qualified in structural repairs or maintenance to create plans or specifications to implement the covered maintenance. The covered building owner shall cause any plans or specifications created pursuant to this subparagraph to be filed with the municipal appointing authority or enforcing agency.
(3) If the post-occupancy structural inspector's inspection finds that there is no need for corrective maintenance, the written report shall be filed with the enforcing agency or municipal appointing authority.
(4) Any written reports issued by the post-occupancy structural inspector pursuant to this section shall be provided to the covered building's owner and shall be made available to any resident of a covered building upon request.
g. Inspections conducted pursuant to this section may be conducted in conjunction with other required inspections, including, but not limited to, inspections required pursuant to the "Hotel and Multiple Dwelling Law," P.L.1967, c.76 (C.55:13A-1 et seq.).

N.J.S. § 52:27D-132.4