In carrying out the provisions of paragraph (1) of this subsection the commissioner shall cause to be developed a method of nondestructive testing or other procedure capable of ascertaining inevitable premature failure of an FRT plywood installation. As used in this section "inevitable premature failure" means a condition in which deterioration of the FRT plywood, ascribable to a defect: in any of the materials or techniques used in its manufacture, in its fire retardant treatment, or due to other actions or omissions by responsible parties; and which is ascertainable within the ten-year warranty period and can be accurately predicted in accordance with the commissioner's testing procedure to make replacement of the material necessary within the ten-year warranty period. Inevitable premature failure shall be deemed to constitute a major construction defect as of the time of its detection.
A person aggrieved by any ruling, action, order or notice of the commissioner denying an FRT plywood claim, in whole or in part, filed pursuant to section 2 of this act, shall be entitled to an administrative hearing. The application for the hearing shall be filed with the commissioner by the 15th day after receipt by the person of the notice of the ruling, action, order or notice. The only issues that may be raised in the administrative hearing are whether the test or other method used by the commissioner to determine if the subjected premises were damaged in accordance with the requirements of paragraph (1) of this subsection was administered properly, or whether the proposed method of remediation was within the guidelines set pursuant to paragraph (2) of this subsection. The aggrieved person shall have the burden to demonstrate that the test or other method was administered improperly or that the proposed method of remediation was within the guidelines.
N.J.S. § 46:3B-15