Current through 82nd (2023) Legislative Session Chapter 535 and 34th (2023) Special Session Chapter 1 and 35th (2023) Special Session Chapter 1
Section 534.260 - Project for recharge, storage and recovery of water: Contents of application for permit The State Engineer shall prescribe and furnish guidelines for an application for a permit for a project. The application must include:
1. A fee for application of $2,500;2. The name and mailing address of the applicant;3. The name of the area of active management, groundwater basin or groundwater sub-basin, as applicable, in which the applicant proposes to operate the project;4. The name and mailing address of the owner of the land on which the applicant proposes to operate the project;5. The legal description of the location of the proposed project;6. Such evidence of financial and technical capability as the State Engineer requires;7. The source, quality and annual quantity of water proposed to be recharged, and the quality of the receiving water;8. The legal basis for acquiring and using the water proposed to be recharged;9. A description of the proposed project including its capacity and plan of operation;10. A copy of a study that demonstrates: (a) The area of hydrologic effect of the project;(b) That the project is hydrologically feasible;(c) That the project will not cause harm to users of land and water within the area of hydrologic effect; and(d) The percentage of recoverable water;11. The proposed duration of the permit; and12. Any other information which the State Engineer requires.Added to NRS by 1987, 1771Added to NRS by 1987, 1771