Current through the 2024 Regular Session
Section 17-17-227 - County adoption of local nonhazardous solid waste management plan; contents; municipality participation; interlocal agreements; notice, ratification, review and implementation; alternative procedure for modifications; department to maintain copies; noncompliance with publication requirements(1) Each county, in cooperation with municipalities within the county, shall prepare, adopt and submit to the commission for review and approval a local nonhazardous solid waste management plan for the county. Each local nonhazardous solid waste management plan shall include, at a minimum, the following:(a) An inventory of the sources, composition and quantities by weight or volume of municipal solid waste annually generated within the county, and the source, composition and quantity by weight or volume of municipal solid waste currently transported into the county for management;(b) An inventory of all existing facilities where municipal solid waste is currently being managed, including the environmental suitability and operational history of each facility, and the remaining available permitted capacity for each facility;(c) An inventory of existing solid waste collection systems and transfer stations within the county. The inventory shall identify the entities engaging in municipal solid waste collection within the county;(d) A strategy for achieving a twenty-five percent (25%) waste reduction goal through source reduction, recycling or other waste reduction technologies;(e) A projection, using acceptable averaging methods, of municipal solid waste generated within the boundaries of the county over the next twenty (20) years;(f) An identification of the additional municipal solid waste management facilities, including an evaluation of alternative management technologies, and the amount of additional capacity needed to manage the quantities projected in paragraph (e);(g) An estimation of development, construction, operational, closure and post-closure costs, including a proposed method for financing those costs;(h) A plan for meeting any projected capacity shortfall, including a schedule and methodology for attaining the required capacity;(i) A determination of need by the county, municipality, authority or district that is submitting the plan, for any new or expanded facilities. A determination of need shall include, at a minimum, the following:(i) Verification that the proposed facility meets needs identified in the approved local nonhazardous solid waste management plan which shall take into account the quantities of municipal solid waste generated and the design capacities of existing facilities;(ii) Certification that the proposed facility complies with local land use and zoning requirements, if any;(iii) Demonstration, to the extent possible, that operation of the proposed facility will not negatively impact the waste reduction strategy of the county, municipality, authority or district that is submitting the plan;(iv) Certification that the proposed service area of the proposed facility is consistent with the local nonhazardous solid waste management plan; and(v) A description of the extent to which the proposed facility is needed to replace other facilities; and(j) Any other information the commission may require.(2) Each local nonhazardous solid waste management plan may include: (a) The preferred site or alternative sites for the construction of any additional municipal solid waste management facilities needed to properly manage the quantities of municipal solid waste projected for the service areas covered by the plan, including the factors which provided the basis for identifying the preferred or alternative sites; and(b) The method of implementation of the plan with regard to the person who will apply for and acquire the permit for any planned additional facilities and the person who will own or operate any of the facilities.(3) Each municipality shall cooperate with the county in planning for the management of municipal solid waste generated within its boundaries or the area served by that municipality. The governing authority of any municipality which does not desire to be included in the local nonhazardous solid waste management plan shall adopt a resolution stating its intent not to be included in the county plan. The resolution shall be provided to the board of supervisors and the commission. Any municipality resolving not to be included in a county waste plan shall prepare a local nonhazardous solid waste management plan in accordance with this section.(4) The board of supervisors of any county may enter into interlocal agreements with one or more counties as provided by law to form a regional solid waste management authority or other district to provide for the management of municipal solid waste for all participating counties. For purposes of Section 17-17-221 through Section 17-17-227, a local nonhazardous solid waste management plan prepared, adopted, submitted and implemented by the regional solid waste management authority or other district is sufficient to satisfy the planning requirements for the counties and municipalities within the boundaries of the authority or district.(5)(a) Upon completion of its local nonhazardous solid waste management plan, the board of supervisors of the county shall publish in at least one (1) newspaper as defined in Section 13-3-31, having general circulation within the county a public notice that describes the plan, specifies the location where it is available for review, and establishes a period of thirty (30) days for comments concerning the plan and a mechanism for submitting those comments. The board of supervisors shall also notify the board of supervisors of adjacent counties of the plan and shall make it available for review by the board of supervisors of each adjacent county. During the comment period, the board of supervisors of the county shall conduct at least one (1) public hearing concerning the plan. The board of supervisors of the county shall publish twice in at least one (1) newspaper as defined in Section 13-3-31, having general circulation within the county, a notice conspicuously displayed containing the time and place of the hearing and the location where the plan is available for review.(b) After the public hearing, the board of supervisors of the county may modify the plan based upon the public's comments. Within ninety (90) days after the public hearing, each board of supervisors shall approve a local nonhazardous solid waste management plan by resolution.(c) A regional solid waste management authority or other district shall declare the plan to be approved as the authority's or district's solid waste management plan upon written notification, including a copy of the resolution, that the board of supervisors of each county forming the authority or district has approved the plan.(6) Upon ratification of the plan, the governing body of the county, authority or district shall submit it to the commission for review and approval in accordance with Section 17-17-225. The commission shall, by order, approve or disapprove the plan within one hundred eighty (180) days after its submission. The commission shall include with an order disapproving a plan a statement outlining the deficiencies in the plan and directing the governing body of the county, authority or district to submit, within one hundred twenty (120) days after issuance of the order, a revised plan that remedies those deficiencies. If the governing body of the county, authority or district, by resolution, requests an extension of the time for submission of a revised plan, the commission may, for good cause shown, grant one (1) extension for a period of not more than sixty (60) additional days.(7) After approval of the plan or revised plan by the commission, the governing body of the county, authority or district shall implement the plan in compliance with the implementation schedule contained in the approved plan.(8) The governing body of the county, authority or district shall annually review implementation of the approved plan. The commission may require the governing body of each local government or authority to revise the local nonhazardous solid waste management plan as necessary, but not more than once every five (5) years.(9) If the commission finds that the governing body of a county, authority or district has failed to submit a local nonhazardous solid waste management plan, obtain approval of its local nonhazardous solid waste management plan or materially fails to implement its local nonhazardous solid waste management plan, the commission shall issue an order in accordance with Section 17-17-29, to the governing body of the county, authority or district.(10) The commission may, by regulation, adopt an alternative procedure to the procedure described in this section for the preparation, adoption, submission, review and approval of minor modifications of an approved local nonhazardous solid waste management plan. For purposes of this section, minor modifications may include administrative changes or the addition of any noncommercial nonhazardous solid waste management facility.(11) The executive director of the department shall maintain a copy of all local nonhazardous solid waste management plans that the commission has approved and any orders issued by the commission.(12) If a public notice required in subsection (5) was published in a newspaper as defined in Section 13-3-31, having general circulation within the county but was not published in a daily newspaper of general circulation as required by subsection (5) before April 20, 1993, the commission shall not disapprove the plan for failure to publish the notice in a daily newspaper. Any plan disapproved for that reason by the commission shall be deemed approved after remedying any other deficiencies in the plan.(13) Notwithstanding any provision of this chapter, no solid waste management plan shall include a proposed new municipal solid waste landfill in any county that has two (2) or more existing permitted municipal solid waste landfills and such new landfill will be located within a five (5) mile radius of an existing municipal solid waste landfill, unless a referendum election has been conducted and approved pursuant to Section 17-17-237. This subsection (13) shall not apply to the proposed expansion or replacement of any permitted landfill by the permit holder, and shall not apply to any rubbish disposal facilities, transfer stations, land application sites, composting facilities, solid waste processing facilities, chipping/mulching facilities, industrial/institutional/special waste landfills, industrial/institutional/special waste rubbish sites, waste tire processing facilities, commercial waste tire collection sites, local government waste tire collection sites or generator waste tire collection sites, and none of those facilities, stations, landfills or sites shall be counted as a landfill within a county for the purpose of determining whether a referendum election is required to be conducted in the county as provided in this section.Laws, 1991, ch. 494, § 15; Laws, 1993, ch. 600, § 1; Laws, 1998, ch. 498, § 2; Laws, 2006, ch. 587, § 1, eff. 7/1/2006.Amended by Laws, 2021, ch. 308, HB 949,§ 1, eff. 3/10/2021.