Subd. 3.Permit conditions.Permit holders must construct, install, operate, maintain, and report on the submerged closed loop heat exchanger system to comply with permit conditions identified by the commissioner, which must address:
(1) notification to the commissioner at intervals specified in the permit conditions;(2) material and design specifications and standards;(3) heat exchange fluid requirements;(4) signage requirements;(5) backflow prevention requirements;(6) pressure tests of the system;(7) documentation of the system construction;(8) requirements for maintenance and repair of the system;(9) removal of the system upon termination of use or failure;(10) disclosure of the system at the time of property transfer;(11) requirement to obtain approval from the commissioner prior to deviation of the approved plans and conditions; and(12) any additional information the commissioner deems necessary to protect public health and safety of the groundwater.