Before installing or constructing the project, the petitioner or drainage authority shall obtain all required permits and all necessary rights-of-way and flowage easements from owners of land to be affected by it.
The order of the drainage authority modifying the drainage system must identify the parties responsible for construction, operation, and maintenance of the drainage system modification and the amount, if any, of drainage system funds for the project. If the part of the drainage system located within the project boundaries is in need of repairs, the petitioner's engineer shall estimate the cost at the time of petition of these separable repairs. The drainage authority shall consider the separable repair costs that will be avoided as a result of the petitioned project, as well as any other benefits of the project to the drainage system, when determining whether or how much to contribute to the petitioned project.
Minn. Stat. § 103E.227
1990 c 391 art 5 s 32; 2010 c 298 s 3; 2013 c 4 s 10