Before establishing a drainage project, the drainage authority must consider each of the following criteria:
When planning a drainage project or a repair under section 103E.715, and prior to making an order on the engineer's preliminary survey report for a drainage project or the engineer's report for a repair, the drainage authority shall investigate the potential use of external sources of funding to facilitate the purposes indicated in section 103E.011, subdivision 5, and alternative measures in subdivision 1, clause (2). This investigation shall include early coordination with applicable soil and water conservation district and county and watershed district water planning authorities about potential external sources of funding and technical assistance for these purposes and alternative measures. The drainage authority may request additional information about potential funding or technical assistance for these purposes and alternative measures from the executive director of the Board of Water and Soil Resources.
In any proceeding to establish a drainage project, or in the construction or repair of or other work affecting a public drainage system under any law, the drainage authority or other authority having jurisdiction over the proceeding must give proper consideration to conservation of soil, water, wetlands, forests, wild animals, and related natural resources, and to other public interests affected, together with other material matters as provided by law in determining whether the project will be of public utility, benefit, or welfare.
Minn. Stat. § 103E.015
1990 c 391 art 5 s 3; 2014 c 164 s 1-3