The commissioner of commerce, in consultation with the Public Utilities Commission, shall annually by January 15 submit a written report to the chairs and the ranking minority members of the legislative committees with primary jurisdiction over energy policy that contains a narrative describing what electric transmission infrastructure is needed within the state over the next 15 years and what specific progress is being made to meet that need. To the extent possible, the report must contain a description of specific transmission needs and the current status of proposals to address that need. The report must identify any barriers to meeting transmission infrastructure needs and make recommendations, including any legislation, that are necessary to overcome those barriers. The report must be based on the best available information and must describe what assumptions are made as the basis for the report. If the commissioner determines that there are difficulties in accurately assessing future transmission infrastructure needs, the commissioner shall explain those difficulties as part of the report. The commissioner is not required to conduct original research to support the report. The commissioner may utilize information the commissioner, the commission, and the Office of Energy Security possess and utilize in carrying out their existing statutory duties related to the state's transmission infrastructure. The report must be in easily understood, nontechnical terms.
Minn. Stat. § 216C.054
2009 c 110s 28