Current through Public Act 171 of the 2024 Legislative Session
Section 324.30909 - Engineering and economic reports; cost estimates(1) The lake board shall retain a licensed professional engineer to prepare an engineering feasibility report, an economic study report, and an estimate of cost. The report shall include, when applicable, recommendations for normal lake levels and the methods for maintaining those levels.(2) The engineering feasibility report shall include the methods proposed to implement the recommended improvements, such as dredging, removal, disposal, and disposal areas for undesirable materials from the lake. The report shall include an investigation of the groundwater conditions and possible effects on lake levels from removal of bottom materials. A study of existing nutrients and an estimate of possible future conditions shall be included. Estimate of costs of right-of-way shall be included.(3) The estimate of cost prepared under subsection (1) shall show probable assessments for the project. The economic report shall analyze the existing local tax structure and the effects of the proposed assessments on the local units of government involved. A copy of the report shall be furnished to each member of the lake board.Add. 1995, Act 59, Imd. Eff. 5/24/1995 .