[2021, c. 560, §7(AMD).]
[2021, c. 31, §2(RP).]
A fee for administrative costs, which must be at a rate set by rule by the board but may not exceed 1% of the loan, must be charged on a loan made for a project the total cost of which exceeds $50,000. This fee must be deposited in the fund.
[2021, c. 31, §3(NEW).]
[2013, c. 403, §8(NEW).]
7 M.R.S. § 974-A