Laboratory analyses required in support of the licensing, operation, closure or postclosure care of a solid waste facility must be performed by a qualified laboratory. Six months after the adoption of laboratory certification rules required by Title 22, section 567, all laboratories must be certified or exempted from certification pursuant to those rules. [1993, c. 378, §9(NEW).]
38 M.R.S. § 1310-Z