[1997, c. 316, §3(NEW).]
When determining the market value of generation assets and purchased power contracts, the commission shall rely to the greatest extent possible on market information, including, but not limited to, market valuations that become known as generation assets and the rights to power under contracts with qualifying facilities are sold.
[1997, c. 316, §3(NEW).]
[1997, c. 316, §3(NEW).]
[1997, c. 316, §3(NEW).]
[1997, c. 316, §3(NEW).]
For purposes of this subsection, "adjustable stranded costs" means stranded costs other than stranded costs associated with divested generation assets.
[1997, c. 316, §3(NEW).]
[1997, c. 316, §3(NEW).]
[1999, c. 398, Pt. L, §1(AMD).]
35-A M.R.S. § 3208