Me. Stat. tit. 11 § 3-1113

Current through 131st (2023-2024) Legislature Chapter 684
Section 3-1113 - Date of instrument
(1). An instrument may be antedated or postdated. The date stated determines the time of payment if the instrument is payable at a fixed period after date. Except as provided in section 4-401, subsection (1-B), an instrument payable on demand is not payable before the date of the instrument.

[1993, c. 293, Pt. A, §2(NEW).]

(2). If an instrument is undated, its date is the date of its issue or, in the case of an unissued instrument, the date it first comes into possession of a holder.

[1993, c. 293, Pt. A, §2(NEW).]

11 M.R.S. § 3-1113

1993, c. 293, §A2 (NEW) .