Current through P.L. 171-2024
Section 8-23-9.5-23 - [Effective Until 7/1/2024] Terminating contractsThe department, a CMGC, or a PDB may terminate a contract as follows:
(1) For a contract with a CMGC:(A) at any time under phase one (1); or(B) in accordance with the provisions provided in the request for proposals under phase two (2); of the contract.
(2) For a contract with a PDB, in accordance with the provisions provided in the request for proposals.Added by P.L. 60-2023,SEC. 2, eff. 7/1/2023.This section is set out more than once due to postponed, multiple, or conflicting amendments.