Ind. Code § 8-23-9.5-20

Current through P.L. 171-2024
Section 8-23-9.5-20 - Replacing subcontractors
(a) A CMGC or PDB may not replace a person identified as a person with which the CMGC or PDB proposes to enter into a subcontract for services under a contract without:
(1) the approval of the department; and
(2) a written determination by the department that a legitimate reason exists for the replacement.
(b) If a CMGC or a PDB violates subsection (a), the department may cancel the award of or may terminate the contract.

IC 8-23-9.5-20

Added by P.L. 60-2023,SEC. 2, eff. 7/1/2023.