Ind. Code § 8-23-23-2

Current through P.L. 171-2024
Section 8-23-23-2 - Crosswalk curb ramps
(a) This section applies only to curbs that are constructed or reconstructed after June 30, 1978.
(b) All new construction or reconstruction of public roads or streets funded wholly or in part by funds of the state, a county, a city, or a town must include the installation of permanent curb ramps at crosswalks at all intersections where curbs and permanent sidewalks are constructed.

IC 8-23-23-2

As added by P.L. 18-1990, SEC.232.