Current through P.L. 171-2024
Section 8-17-8-2 - Preparation of map; compensation(a) The plan commission or county executive shall direct the county engineer or may request the county surveyor to prepare the maps. The county surveyor or the county engineer may be compensated in addition to the salary the surveyor or engineer receives for preparation of the maps, in an amount to be determined by the plan commission or the county executive, subject to the approval of the county fiscal body.(b) All expenses incidental to the preparation of the maps, including the county surveyor's and county engineer's compensation, shall be paid out of the county general fund.(Formerly: Acts 1953, c.28, s.2.) As amended by P.L. 86-1988, SEC.136; P.L. 3-1989, SEC.66; P.L. 276-2001, SEC.3.