As used in this chapter, "make-ready infrastructure" means the:
installed to connect charging infrastructure to an electric utility's distribution system, including any necessary upgrades to the electric utility's distribution system.
IC 8-1-43-5
As used in this chapter, "make-ready infrastructure" means the:
installed to connect charging infrastructure to an electric utility's distribution system, including any necessary upgrades to the electric utility's distribution system.
IC 8-1-43-5