Current through P.L. 171-2024
Section 8-1-41-13 - Sound level limitations; waiver of requirement with consent of affected property owners(a) Subject to subsection (b), and except as otherwise allowed by IC 36-7-4-1109, a project owner may not install or locate a wind power device in a unit unless the project owner demonstrates to the permit authority that the wind power device will operate in a manner such that the sound attributable to the wind power device will not exceed an hourly average sound level of fifty (50) A-weighted decibels, as modeled at the outer wall of an affected dwelling.(b) The requirement set forth in subsection (a) may be waived with respect to any one (1) wind power device, subject to the written consent of the owner of each affected property.Added by P.L. 90-2022,SEC. 1, eff. 7/1/2022.