as set forth in IC 36-7-4-1109;
of one (1) or more wind power devices in a unit that before July 1, 2022, has approved such permitting, construction, installation, siting, modification, operation, or decommissioning; or
entered into before July 1, 2022, with respect to the permitting, construction, installation, siting, modification, operation, or decommissioning of one (1) or more wind power devices in one (1) or more units.
IC 8-1-41-1