Ind. Code § 8-1-39-7.8

Current through P.L. 171-2024
Section 8-1-39-7.8 - "TDSIC plan"

As used in this chapter, "TDSIC plan", or plan, means a public utility's plan for eligible transmission, distribution, and storage system improvements over the course of a period of:

(1) at least five (5) years; and
(2) not more than seven (7) years.

IC 8-1-39-7.8

Added by P.L. 89-2019,SEC. 2, eff. 4/24/2019.