Ind. Code § 8-1-39-15

Current through P.L. 171-2024
Section 8-1-39-15 - Revised rate schedule following general increase in rates and charges

A public utility that has implemented a TDSIC under this chapter shall file revised rate schedules resetting the charge if new basic rates and charges become effective for the public utility following a commission order authorizing a general increase in rates and charges that includes in the public utility's rate base eligible transmission, distribution, and storage system improvements reflected in the TDSIC.

IC 8-1-39-15

Added by P.L. 133-2013, SEC. 5, eff. 4/30/2013.