Browse as ListSearch Within- Section 8-1-32.3-1 - "Antenna"
- Section 8-1-32.3-2 - "Base station"
- Section 8-1-32.3-3 - "Business day"
- Section 8-1-32.3-4 - "Collocation"
- Section 8-1-32.3-4.2 - "Communications service provider"
- Section 8-1-32.3-5 - "Electrical transmission tower"
- Section 8-1-32.3-6 - "Equipment compound"
- Section 8-1-32.3-7 - "Existing structure"
- Section 8-1-32.3-7.5 - "Micro wireless facility"
- Section 8-1-32.3-8 - "Permit authority"
- Section 8-1-32.3-9 - "Small cell facility"
- Section 8-1-32.3-10 - "Small cell network"
- Section 8-1-32.3-11 - "Substantial modification of a wireless support structure"
- Section 8-1-32.3-12 - "Utility pole"
- Section 8-1-32.3-12.5 - "Wireless communications service"
- Section 8-1-32.3-13 - "Wireless facility"
- Section 8-1-32.3-14 - "Wireless support structure"
- Section 8-1-32.3-15 - Permits; exemptions; areas designated for underground or buried utilities; notice of permit applications; neighborhood specific guidelines; historic preservation districts and areas; identification of owner of small cell facility and supporting structure; areas designated for underground or buried utilities after April 14, 2017, and before May 2, 2017
- Section 8-1-32.3-16 - Application fees; prohibited unless required for similar types of development; limitations
- Section 8-1-32.3-17 - Discrimination among providers or utilities prohibited; limits on fall zone requirements; maximum height restrictions or minimum separation distance requirements prohibited
- Section 8-1-32.3-18 - Zoning, land use, planning, and permitting authority not affected; land use laws and ordinances apply
- Section 8-1-32.3-19 - Eligible applicants; application requirements
- Section 8-1-32.3-20 - Application to construct new wireless support structure; requirements; review for completeness; notification of approval or denial; additional time for review
- Section 8-1-32.3-21 - Application for substantial modification of wireless support structure; requirements; review for completeness; notification of approval or denial; additional time for review
- Section 8-1-32.3-22 - Application for collocation; requirements; conformance with building permit requirements; consolidated application; review for completeness; notification of approval or denial; additional time for review
- Section 8-1-32.3-23 - Written notice of approval or denial; basis for decision; application considered approved upon authority's failure to act
- Section 8-1-32.3-24 - Guidelines to protect confidential or proprietary information
- Section 8-1-32.3-25 - Utility poles and electrical transmission towers; requirements and regulations prohibited
- Section 8-1-32.3-26 - Small cell facilities; exemption for placement in right-of-way; small cell networks; application fees; permit authority's proposed alternative location; procedures and time for review; prohibited acts by permit authority; safety regulations for use of public right-of-way; utility poles owned or controlled by governmental unit
- Section 8-1-32.3-27 - Collocation on privately owned utility poles, wireless support structures, or property; owner's consent; utility poles and wireless support structures owned, controlled, or operated by public utility