Ind. Code § 5-30-8-2

Current through P.L. 171-2024
Section 5-30-8-2 - Replacement of subcontractor for primary design services and construction services
(a) A person identified under IC 5-30-7-1(2) as a person with whom the design-builder proposes to enter into subcontracts for primary design services and primary construction services under the design-build contract may not be replaced without the approval of the public agency and a written determination by the public agency that a legitimate reason exists for the replacement.
(b) If a design-builder violates subsection (a), the public agency may cancel the award of or may terminate a design-build contract.

IC 5-30-8-2

As added by P.L. 74-2005, SEC.1.