Ind. Code § 4-13.6-7-3

Current through P.L. 171-2024
Section 4-13.6-7-3 - Amount of retainage withheld
(a) To determine the amount of retainage to be withheld, the division shall elect one (1) of the following options:
(1) To withhold no more than six percent (6%) of the dollar value of all work satisfactorily completed until the public work is fifty percent (50%) complete, and nothing further after that.
(2) To withhold no more than three percent (3%) of the dollar value of all work satisfactorily completed until the public work is substantially complete.
(b) Upon substantial completion of the work, the division shall withhold the following:
(1) If there are any remaining uncompleted minor items, until those items are completed, an amount equal to two hundred percent (200%) of the value of each item as determined by the architect-engineer.
(2) Any amounts required to be withheld under section 8(b) of this chapter.

IC 4-13.6-7-3

Amended by P.L. 75-2012, SEC. 1, eff. 7/1/2012.
As added by P.L. 24-1985, SEC.7.