Ind. Code § 33-38-13-24

Current through P.L. 171-2024
Section 33-38-13-24 - Extension of time
(a) The chairman of the commission may extend the time for:
(1) filing an answer;
(2) conducting a hearing before the commission; and
(3) filing objections to the report of the masters.
(b) The presiding master may, with the approval of the chairman of the commission, extend the time for conducting a hearing before the masters.

IC 33-38-13-24

Pre-2004 Recodification Citation: 33-2.1-5-17.

As added by P.L. 98-2004, SEC.17.