On and after the operative date of the Valuation Manual specified in section 34 of this chapter, as used in this chapter, "principal based valuation" means a reserve valuation that:
IC 27-1-12.8-13
On and after the operative date of the Valuation Manual specified in section 34 of this chapter, as used in this chapter, "principal based valuation" means a reserve valuation that:
IC 27-1-12.8-13