A well that is drilled after December 31, 1987, and not equipped with casing must be plugged by the driller within seventy-two (72) hours after drilling is completed.
IC 25-39-4-4
A well that is drilled after December 31, 1987, and not equipped with casing must be plugged by the driller within seventy-two (72) hours after drilling is completed.
IC 25-39-4-4